

{"id":1762,"date":"2022-07-19T14:52:00","date_gmt":"2022-07-19T14:52:00","guid":{"rendered":"https:\/\/mgm.on.ca\/?p=1762"},"modified":"2022-07-19T18:54:00","modified_gmt":"2022-07-19T18:54:00","slug":"king-toronto","status":"publish","type":"post","link":"https:\/\/mgm.on.ca\/?p=1762","title":{"rendered":"KING Toronto"},"content":{"rendered":"\n<p>Address: 485-539 King Street West, Toronto, Ontario<\/p>\n\n\n\n<p>Developer: Westbank Corp. and Allied Properties REIT<\/p>\n\n\n\n<p>Architects: Bjarke Ingels Group (BIG) and Diamond Schmitt Architects <\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-vertically-aligned-top is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-video\"><video height=\"540\" style=\"aspect-ratio: 960 \/ 540;\" width=\"960\" autoplay controls loop src=\"https:\/\/mgm.on.ca\/wp-content\/uploads\/2022\/07\/KING-Toronto-slideshow-2.mp4\"><\/video><figcaption>Renders and photos of KING Toronto development <\/figcaption><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>This development includes the construction of a mixed-use development composed of a permitter block of residential, retail, and boutique office spaces, surrounding a central public plaza situated over four underground parking levels. The public plaza will include a hardscaped courtyard with a water feature, an intensive landscaped gathering and seating areas.<\/p>\n\n\n\n<p>As this development is located within the heart of Toronto\u2019s downtown King West neighbourhood, a vital design goal for the site engineering was to compliment the elegant architectural design while meeting the City\u2019s stringent stormwater management requirements. Low-Impact Design (LID) principles were used throughout the design to focus on water retention and re-use. Specifically, drainage features were integrated into the landscaping and courtyard design, and rain garden planters and green roofs systems were included throughout the site to significantly increase stormwater retention and reduce runoff. Excess stormwater runoff will be collected and utilized for the building\u2019s internal plumbing and external irrigation. The LID components enabled the site to achieve water retention objectives that far exceeded the City\u2019s standards while ensuring the aesthetic, green-focused architecture and site design remained uncompromised.<\/p>\n\n\n\n<p>This project is currently in the construction phase with MGM Consulting continuing to provide construction administration services including periodic site inspections. The estimated completion date for KING Toronto is set for Summer 2023.<\/p>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Address: 485-539 King Street West, Toronto, Ontario Developer: Westbank Corp. and Allied Properties REIT Architects: Bjarke Ingels Group (BIG) and Diamond Schmitt Architects This development includes the construction of a mixed-use development composed of a permitter block of residential, retail, and boutique office spaces, surrounding a central public plaza situated over four underground parking levels. &hellip; <a href=\"https:\/\/mgm.on.ca\/?p=1762\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;KING Toronto&#8221;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":1779,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_custom_body_class":"","_custom_post_class":"","footnotes":""},"categories":[4],"tags":[],"class_list":["post-1762","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"acf":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/mgm.on.ca\/index.php?rest_route=\/wp\/v2\/posts\/1762","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mgm.on.ca\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mgm.on.ca\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mgm.on.ca\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/mgm.on.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1762"}],"version-history":[{"count":14,"href":"https:\/\/mgm.on.ca\/index.php?rest_route=\/wp\/v2\/posts\/1762\/revisions"}],"predecessor-version":[{"id":1922,"href":"https:\/\/mgm.on.ca\/index.php?rest_route=\/wp\/v2\/posts\/1762\/revisions\/1922"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mgm.on.ca\/index.php?rest_route=\/wp\/v2\/media\/1779"}],"wp:attachment":[{"href":"https:\/\/mgm.on.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1762"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mgm.on.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1762"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mgm.on.ca\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1762"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}